Projects

Building Projects

VM Corp team completed/executed/did tendering for the following projects.

Jaipur

Pallacia

Construction of high end extra luxurious residential apartment project “Pallacia” at Jaipur. The project consists of ground plus nine floors and 3 basements. The constructed area is 10 Lakh Sq.ft. Completion period was 3 years and total project construction cost was INR 600 Crores.

Gurgaon

Edge Tower, Ramprastha City

Construction of edge tower multi-storey building which is ground and 20 stories at Gurgaon. The construction area is 25 Lakh sq. ft. Cost of the zzzaproject is 286 Cr.
Gurgaon

SKY-Z under Ramprastha City

Construction of Sky Z multi-storey building which is Ground and 20 stories at Gurgaon. The construction area is 7 lacs Sq. Ft. Cost of project is 78 cr.
Hissar

Residential Project DGMAP

Construction of Residential project under DGMAP (Indian Army) at Hissar. Construction area is 10 Lacs Sq. Feet. Cost of project 80 cr.

Babina

Residential Project DGMAP

Construction of Residential project under DGMAP (Indian Army) at Babina. The Construction area is 08 Lacs Sq. Feet. Cost of project 60 cr.

Gurgaon

NBCC height

Construction of NBCC Height multi-storey building which is Ground and 12 Stories at Gurgaon. Construction area is 10 lacs Sq.Ft. Cost of project is 112 cr.

Kolkata

Upohar

The Upohar-The Condoville at Chawkgaria, EM Bypass, Group Housing 13 towers. G+19 Spread over 18 acres of land. It consists of LIG – 248 one bedroom apartments, Comfort MIG – 360 two bedroom apartments and Luxury HIG – 605 two to three bedroom apartments. The construction area is approx. 20 lakh sq.ft.
Kolkata

City Center Mall

The city center commercial Mall. The construction area of City centre New Town is 6.8 Lakh square feet using Pre-tensioned Slabs (PT Slabs). It consists of G+5 with two basements, multiplex, shops, Hyper Market, Food Court, WTP, STP, Plumbing, Firefighting, etc.

Jaipur

EWS Project

Construction of 615 EWS Residential apartments project. Ground and 7 stories at Shivdaspura, Jaipur. The construction area is 2.0 Lakh Sq. Ft. and cost of project was INR 20 CR.
Kota

Om Urban Height

Construction of Om Urban Height Residential apartment building which is ground and 10 stories at KOTA. The completion period was 2 Year. The construction area was 8 Lakh sq.ft and Cost of project was INR 120 Crores.

 

Township Projects

Jaipur

South City, Chaksu

The South City Group was developing an Integrated Township as South City at Jaipur. The area of mentioned city is 432 Acres. Detail designing of all infrastructure (i.e. water supply, sewerage, Roads, SW Drain), Finalization of

Master Plan, Execution of Villas, Group Housing [16 towers G+8], Roads, Water Supply, Sewerage, Landscaping & Commercial Mall.

Jaipur

Sushant City

The development of Sushant city of Ansal api Jaipur. The area of city is 600 Acres. Execution of 600 Nos of Villas, Roads, Water Supply, Sewerage & Landscape. Group Housing G+8 Flats.
Ujjain

Smart City

External & Internal infrastructure works included Roads, water supply & sewerage system, STP, WTP, Storm water drainage and all allied works at Vikram Udyogpuri, Ujjain, MP, UNDER Delhi Mumbai Industrial Corridor Development Corporation Limited, ON Design Build & Operate Basis; cost of project was INR 332 Cr.

Road Projects

Ludhiana

6-Laning Road Project under PIDB

6-Laning BOT Ring Road Project under Jaipur development Authority at JAIPUR. The project consist of 47 Km 6-laning road, 22 minor and major Bridges, Junctions, two toll plaza etc. Cost of project is 1100 cr.

Jaipur

Jaipur Ring Road (Tendering work)

6-Laning BOT Ring Road Project under Jaipur development Authority at JAIPUR. The project consist of 47 Km 6-laning road, 22 minor and major Bridges, Junctions, two toll plaza etc. Cost of project is 1100 cr.
Jaipur

Jaipur to Bhilwara

Public Private Partnership in Jaipur Bhilwara Highway (SH-12) Development of two lane road from Jaipur (SH-12) to Bhilwara (NH-79) via Malpura, Kekri, Mandal to be implemented on design, build, finance, operate and transfer (DOBFOT) pattern for a pre-agreed concession period.  The length of road was 212 KM And cost of project was INR 353 Cr.

Water Supply & Sewer Projects

Jaipur

Pipe Line Project under RUIDP, under ADB.

Laying, Jointing, Testing and Commissioning of 330 Km AC/upvc/DI Pipelines for Water supply scheme in Jhotwara and Kalyan Nagar and restoration of Roads of 30 Km in Jaipur. The project was ADB Funded. fixing of Valves, construction of chambers, trust blocks, Anchor block,   Restoration of Roads for the length of 30 Km as per MORT specifications etc.

Kota

Sewer Line project under RUIDP

Supply, Installation, Testing and Commissioning of sanitary sewers of 150mm dia to 600 mm dia in Kherli Zones, Nayapura, Trunk sewer, civil lines area including construction of Manholes and appurtenances along with restoration of roads in Kota city. It was 78000 Rmt lengths of sewer lines in the urban area of Kota walled city. We have constructed 2650 Nos of different type manholes.

Ajmer

Pipe Line Project (AJM/WS/07)

P/L testing and commission of 1100 mm Dia PSCC/DI pipelines in the urban areas.[ADB]

Bikaner

Pipe Line project ADB

Laying, jointing, testing and commissioning of 1100 mm dia PSCC Pipeline from Sobashar to Newmaster head works at Bikaner.[ADB Funded]

Ajmer

Pipe Line Project (AJM/WS/07)

Laying, jointing, testing & commissioning of 1200 mm dia MS Pipeline with Internal cement lining & outer Epoxy painting at Faridabad.

Churu

Pipe Line project, Dhannasar

Providing laying jointing & commissioning of 90 KM 1100mm PSCC/MS pressure pipe from Dharnasar to Sardar shahar. Under APNI YOJNA.  It was word bank added project.

Ajmer

Pipe Line Project

It was 12 KM laying, jointing, testing and commissioning of 1100 mm dia PSCC / MS Pipeline from Thedoli to Bagera , Ajmer.

Delhi

Pipe Line project

1200 mm dia. PSCC / MS Pipe line from Raw Water Pump House at Bawana to 20 MGD Water Treatment  Plant at Bawana Narela Road (Delhi Jal Board).

Ajmer

Pipe Line Project

17 KM Laying, jointing, testing and commissioning of 1100 mm dia PSCC / MS Pipeline from Joonia to Bagera , Ajmer.
Kaniyad

MS Pipeline Work

Engineering, procurement and construction (EPC) Contract for Construction of intermediate pumping station at chainage 30.9 Km near kaniyad and supply & laying of twin MS Pipeline of 3000 mm dia of 41 Km complete including O & M for 10 years at Botad, Ahmedabad and cost of project was INR 593 Cr.

We Provide the Best Service in The Industry​

For more details, you can get in touch with us.